NYC DOB record · X00640159-I1

2481 Crotona Avenue

2481 Crotona Avenue, Bronx, NY 10458

New building filing in Belmont, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Oct 3, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X00640159-I1

2481 Crotona Avenue

Bronx, NY 10458

New building · status dated Oct 1, 2026

Current record
Approved
Proposed scale
9 stories
Dwelling units
90
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X00640159-I1 as a new building at 2481 Crotona Avenue, Bronx, NY 10458. Its latest published status category is Approved, dated Oct 1, 2026. The filing records 9 proposed stories and 90 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Oct 1, 2026
Proposed scale
9 proposed stories and 90 proposed dwelling units
The building, not the filingthe owner of record and every filing at BIN 2129725Applicant of recordSee the 46 filings that name Marin Architects, P.C.
FiledDec 10, 2021
Current recordApproved
Proposed scale9 stories
Recorded cost$1

What the filing says

A public-record reading of the proposed work.

File herewith erection of 9 stories mixed use building

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X00640159-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X00640159-I1
BBL
2030910087
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
9
Existing dwelling units
Empty in the source
Proposed dwelling units
90
General construction