What the filing says
A public-record reading of the proposed work.
Provide temporary shoring for the relieving wall of the building at first floor. provide temporary shoring for the existing party bearing wall between 249 and 251 macon street.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story two-family home built in 1910, on a 1,933 sq ft lot.
- Built
- 1910
- Last altered
- 2018
- Floors
- 3
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R6B
- Lot area
- 1,933 sq ft
- Building area
- 3,100 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 8, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Jul 23, 2026.
- Construction
Issued Jul 23, 2026 — EMERGENCY WORK ORDER.CNSTRCT WORK IS ONGOING@251 MACON ST PERMIT # B01406638 EAST WALL PARTIALLY COLLAPSED@CELLAR.BLDG IS COMPROMISED & THERE IS A RISK OF COLLAPSE.IMMED INSTALL TEMP SHORING TO SUPPORT EAST PARTY WALL&FLOOR FRAMING.WORK TO BE PERFORMED UNDER DIRECT&CONT SUPERV
- Construction
Issued Jul 22, 2026 — STRUCTURE RENDERED NON-COMPLIANT DUE TO CONSTRUCTION ACTIVITIES FROM ADJACENT PROPERTY (251 MACON STREET). AT THE TIME OF INSPECTION OBSERVED LOAD BEARING PARTY WALL COLLAPSED DUE TO UNPERMITTED FOUNDATION WORK. ALSO OBSERVED CRACKS AT EXP#4 WALL ON ALL 3 FLOORS OF PREMISES.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 8, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01448937-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01448937-I1
- BIN
- 3053116
- BBL
- 3018460055
- Postal code
- 11216 · 1872 filings
- Review type
- Professional Certification
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 2
- Proposed dwelling units
- 2