What the filing says
A public-record reading of the proposed work.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy of the sidewalk shed at frederick douglass lbvd and west 113rd street elevations.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1920, with 12 homes, on a 2,500 sq ft lot.
- Built
- 1920
- Floors
- 5
- Residential units
- 12
- Building type
- Walk-up apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R7-2
- Lot area
- 2,500 sq ft
- Building area
- 11,393 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 13 open notices on record for this building, out of 25 notices on file; the most recent was issued May 16, 2026.
- Construction
Issued May 16, 2026 — EMERGENCY WORK ORDER.AT TIME OF INSPECTION,I OBSERVED CRACKING STONE M ASONRY DECOR,STEP CRACKS,MULTIPLE LOCATIONS AT EXP4 SOUTH ELEVATION,OB SERVED FALLEN DEBRIS HAZARDOUS CONDITION IMPACTING PUBLIC STREETSIDE REMEDY:OWNER TO PROVIDE ADEQUATE SAFETY MEASURES AT EXPOSURE 4 SOUTH E LEVATION TO CONNECT EXISTING SWS & EXTEND THE SHED TO END OF BUILDING
- Construction
Issued Sep 23, 2025 — EMERGENCY WORK ORDER TO IMMEDIATELY PROVIDE SAFETY MEASURES TO SECURE THE PUBLIC @ EXP#4 SOUTH ELEV TO EXTEND SIDE WALK SHED 10 FT. TO SECURE PUBLIC FROM LOOSE STONE @ LINTELS AT EXP#4. REMEDY:TAKE/PROVIDE SAFETY MEASURES TO SECURE PUBLIC SAFETY @ EXP 4 SOUTH. PROVIDE SIDE WALK SHED IMMEDIATELY DIRECT OF LICENSED PROFESSIONAL
- Construction
Issued Sep 23, 2025 — FAILURE TO MAINTAIN EXTERIOR BUILDING IN A CODE COMPLIANT MANNER NOTE: AT TIME OF INSPECTION OBSERVED @ EXP#1 DAMAGED STONE STEP CRACK IN BRICK WORK & DAMAGED CORNICE. EXP#4 OBSERVED DAMAGED STONE LOOSE UNSECURE STONE & BRICK CRACKED BRICK & STONE AND DAMAGED CORNICE REMEDY: REPAIR AND/OR REPLACE
10 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01303139-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 83,050 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01303139-I1
- BIN
- 1058804
- BBL
- 1019390001
- Postal code
- 10030 · 177 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 12
- Proposed dwelling units
- 12








