NYC DOB record · X01466101-I1

2497 Grand Avenue

2497 Grand Avenue, Bronx, NY 10468

Alteration filing in University Heights (North)-Fordham, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 7, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01466101-I1

2497 Grand Avenue

Bronx, NY 10468

Alteration filing · status dated Oct 5, 2026

Current record
Approved
Proposed scale
5 stories
Dwelling units
37
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01466101-I1 as a alteration filing at 2497 Grand Avenue, Bronx, NY 10468. Its latest published status category is Approved, dated Oct 5, 2026. The filing records 5 proposed stories and 37 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 5, 2026
Proposed scale
5 proposed stories and 37 proposed dwelling units
Applicant of recordSee the 641 filings that name Always Fast Services Corp
FiledOct 3, 2026
Current recordApproved
Proposed scale5 stories
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1920, with 37 homes, on a 8,520 sq ft lot.

Built
1920
Floors
5
Residential units
37
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
8,520 sq ft
Building area
36,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 16 notices on file; the most recent was issued Sep 24, 2026.

  • Immediate

    Issued Sep 24, 2026 — REMEDY: INSTALL APPROX. 90 FT OF SWS ALONG THE ENTIRE FRONT OF EXP #1 AND EXTEND OFF EXP# 1 SHED INTO THE COURTYARD BY APPROX 30 FT TO PROTECTION TO UP THE ENTRANCE OF THE BLDG. THE SWS SHALL BE INSTALLED TIGHT BACK TO THE BLDG AND EXTEND OVER THE ENTRANCE TO THE BLDG APPROX 90 FT OF SWS COURTYARD: APPROX 30 FT OF SWS

  • Construction

    Issued Mar 23, 2026 — REQUESTING ENGINEERING REPORT. AT TIME OF INSPECTION OBSERVED EXPOSURE 1(FRONT) & 3(BACK) 1-5 FLOORS & PARAPET VERTICAL, HORIZONTAL, STEP CRACKS & MISSING, LOOSE MORTAR AT BRICKS, STRUCTURAL STABILITY IN QUESTION.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • 3 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01466101-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01466101-I1
BIN
2014645
BBL
2032130080
Review type
Professional Certification
Existing stories
5
Proposed stories
5
Existing dwelling units
37
Proposed dwelling units
37
Sidewalk shed