NYC DOB record · B00634229-S1

25 8 Avenue

25 8 Avenue, Brooklyn, NY 11217

Alteration filing in Park Slope, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00634229-S1

25 8 Avenue

Brooklyn, NY 11217

Alteration filing · status dated Jan 3, 2024

Current record
Approved
Proposed scale
5 stories
Dwelling units
5
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00634229-S1 as a alteration filing at 25 8 Avenue, Brooklyn, NY 11217. Its latest published status category is Approved, dated Jan 3, 2024. The filing records 5 proposed stories and 5 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Jan 3, 2024
Proposed scale
5 proposed stories and 5 proposed dwelling units
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 3024467Applicant of recordSee the 71 filings that name Blue Sky Design, INC.
FiledSep 1, 2022
Current recordApproved
Proposed scale5 stories
Recorded cost$30,000

What the filing says

A public-record reading of the proposed work.

Sidewalk vault replacement which includes the installation of new steel beams and new concrete over the metal deck as shown on plans filed herewith. No change to use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story condominium built in 1891, with 6 homes, on a 6,130 sq ft lot.

Built
1891
Last altered
1997
Floors
5
Residential units
6
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
R8X
Lot area
6,130 sq ft
Building area
21,225 sq ft
Historic district
Park Slope Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 71 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION

  • 5 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00634229-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00634229-S1
BBL
3010607501
Review type
Standard Plan Examination
Existing stories
5
Proposed stories
5
Existing dwelling units
5
Proposed dwelling units
5
Structural work