What the filing says
A public-record reading of the proposed work.
Renovation of partment #4b, 4th floor at 25 west 64th street, new york, ny 10023, exisitng class "a" apartment, as per plans filed herewith. no change nin use, occupancy or egress under this application
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 9-story elevator apartment building built in 1923, with 53 homes, on a 5,021 sq ft lot.
- Built
- 1923
- Floors
- 9
- Residential units
- 53
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R8
- Lot area
- 5,021 sq ft
- Building area
- 33,492 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 26, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 20 notices on file; the most recent was issued Aug 8, 2018.
- Plumbing
Issued Aug 8, 2018 — THE DOB INTENDS TO REVOKE ALL APPROVALS AND PERMITS UNDER PLUMBING LAA #122597724 DUE TO SUSPENSION OF MASTER PLUMBERS LICENSE. STOP ALL PLUMBING WORK UNDER ABOVE MENTIONED PERMIT AND OBTAIN A NEW MASTER PLUMBER TO SUPERSEDE THE PLUMBING PERMIT
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 26, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01384051-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01384051-I1
- BBL
- 1011170019
- Postal code
- 10023 · 460 filings
- Review type
- Standard Plan Examination
- Existing stories
- 9
- Proposed stories
- 9
- Existing dwelling units
- 53
- Proposed dwelling units
- 53








