NYC DOB record · B00708599-S7

250 Central Avenue

250 Central Avenue, Brooklyn, NY 11221

New building filing in Bushwick (West), Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 8, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00708599-S7

250 Central Avenue

Brooklyn, NY 11221

New building · status dated Sep 2, 2026

Current record
Approved
Proposed scale
5 stories
Dwelling units
24
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00708599-S7 as a new building at 250 Central Avenue, Brooklyn, NY 11221. Its latest published status category is Approved, dated Sep 2, 2026. The filing records 5 proposed stories and 24 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Sep 2, 2026
Proposed scale
5 proposed stories and 24 proposed dwelling units
Applicant of recordSee the 61 filings that name Engineering Solutions
FiledJun 27, 2022
Current recordApproved
Proposed scale5 stories
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Filing sprinkler work for NB application B00708599-I1 as per plan filed herewith.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story elevator apartment building built in 2024, with 24 homes, on a 7,400 sq ft lot.

Built
2024
Last altered
2024
Floors
5
Residential units
24
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
R6
Lot area
7,400 sq ft
Building area
19,729 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 8, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 1 notice is on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00708599-S7.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00708599-S7
BIN
3430606
BBL
3032650042
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
5
Existing dwelling units
Empty in the source
Proposed dwelling units
24
sprinkler