NYC DOB record · B00554199-S2

250 Coleridge Street

250 Coleridge Street, Brooklyn, NY 11235

New building filing in Sheepshead Bay-Manhattan Beach-Gerritsen Beach, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00554199-S2

250 Coleridge Street

Brooklyn, NY 11235

New building · status dated May 14, 2024

Current record
Recorded as completed
Proposed scale
2 stories
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00554199-S2 as a new building at 250 Coleridge Street, Brooklyn, NY 11235. Its latest published status category is Recorded as completed, dated May 14, 2024. The filing records 2 proposed stories and 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Recorded as completed
Latest status date
May 14, 2024
Proposed scale
2 proposed stories and 1 proposed dwelling unit
The building, not the filingthe owner of record and every filing at BIN 3246238Applicant of recordSee the 76 filings that name Zproekt Architecture
FiledJul 28, 2021
Current recordRecorded as completed
Proposed scale2 stories
Recorded cost$4,000

What the filing says

A public-record reading of the proposed work.

Replacing existing curb cut

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story one-family home built in 2022, on a 6,000 sq ft lot.

Built
2022
Floors
2
Residential units
1
Building type
One-family home
Land use
One and two family homes
Zoning district
R3-1
Lot area
6,000 sq ft
Building area
3,940 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00554199-S2.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00554199-S2
BBL
3087400040
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
2
Existing dwelling units
Empty in the source
Proposed dwelling units
1
curbCut