What the filing says
A public-record reading of the proposed work.
Remove and install plumbing fixtures as per drawings filed herewith. No change to occupancy, use or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 12-story condominium built in 1908, with 274 homes, on a 41,800 sq ft lot.
- Built
- 1908
- Last altered
- 1980
- Floors
- 12
- Residential units
- 274
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C6-2
- Lot area
- 41,800 sq ft
- Building area
- 323,092 sq ft
- Historic district
- NoHo Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 36 open notices on record for this building, out of 173 notices on file; the most recent was issued Jan 20, 2026.
- Construction
Issued Jan 20, 2026 — EWO DUE TO HAZARDOUS CONDITIONS BTWN 2 EXISTING SIDEWALK SHEDS. AN UNPROTECTED GAP ON W 4TH & MERCER ST. SEVERE CRACKING SPALLING & DETERIORATED BRICK MASONRY @ PARAPET LEVEL, EXTERIOR WALL @ MULT LOCATIONS @ N & W ELEV. REMEDY: OWNER TO IMMEDIATELY INSTALL SIDEWALK SHED BTWN 2 EXISTING SHEDS ON MERCER & W 4TH U/LICENSED PROFESSIONAL
- Construction
Issued Aug 11, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. EXP 2: CRACKS, SPALLING MASONRY AND DETACH METAL AT AWNING OVER ENTRANCE. EXP 2 CRACKS, STEP CRACKS AND CORROSIONS OF FIRE ESCAPE. EXPOSURE 4 BULGING CRACKS AND MISSING BRICKS. REMEDY: REPAIR AND/OR REPLACE
- Hazardous condition (facade)
Issued Feb 17, 2024 — CYCLE 9A UNSAFE REPORT FILED
33 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01466910-S2.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01466910-S2
- BBL
- 1005357501
- Postal code
- 10012 · 651 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 268
- Proposed dwelling units
- 268