NYC DOB record · X01204467-I1

250 West Fordham Road

250 West Fordham Road, Bronx, NY 10468

Alteration filing in University Heights (North)-Fordham, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 3, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01204467-I1

250 West Fordham Road

Bronx, NY 10468

Alteration filing · status dated Sep 30, 2026

Current record
Approved
Proposed scale
1 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01204467-I1 as a alteration filing at 250 West Fordham Road, Bronx, NY 10468. Its latest published status category is Approved, dated Sep 30, 2026. The filing records 1 proposed story.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 30, 2026
Proposed scale
1 proposed story
Applicant of recordSee the 198 filings that name South Bay Engineering PLLC
FiledApr 7, 2025
Current recordApproved
Proposed scale1 stories
Recorded cost$10,000

What the filing says

A public-record reading of the proposed work.

Removal of Retaining Wall in the rear

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a vacant land on a 3,800 sq ft lot.

Residential units
0
Building type
Vacant land
Land use
Vacant land
Zoning district
R5
Lot area
3,800 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 5 notices on file; the most recent was issued Dec 18, 2017.

  • Construction

    Issued Dec 18, 2017 — FTM&ADD'L INFO REQ.UPPER RUBBLE RETAIN WALL SUPPORT ADJOINING UPPER GROUND PREMISES92265 SEDGWICK AVE) HAS PART COLL.FOUND OF ADJ PROP 2265 SEDGWICK AVE MAY BE COMPROMISED.REMEDY:OWN HAS TO ENGAGE NYS PROF ENG FULLY EVAL STRL STAB OF BLDG LOC AT 2265 SEDGWICK AVE.EVALUATION TO BE FINISHED NO LATER THAN 2/15/18

  • Construction

    Issued Jun 6, 2017 — FAILURE TO COMPLY WITH COMMISSIONER ORDER#334559 ISSUED 4/4/17 TO OBTAIN PERMITS FOR REPAIR/DEMO RETAINING WALL AT REAR OF PROP NO LATER THAN 5/5/17.PERMITS HAVE NOT BEEN OBTAINED AS OF 6/6/17.REMEDY:COMPLY WITH COMMISSIONER ORDER#334559 IMMED

  • Construction

    Issued Apr 4, 2017 — FM RETAIN WALL.RETAIN WALL AT REAR OF PREMISES IS PART COLL,DISLODGED& AT RISKOF FURTHER COLL.OWNER RESP TO MAINTAIN WALL IN SAFE COND.JOINT RESP OF OWNERS ON EACH SIDE OF RETAIN STRUCT TO MAINTAIN IT.REMEDY: OWNER ENGAGE NYSPE ENG'R&CONTR EVAL WHOLE RETAIN WALL,OBTAIN PERM FOR REPAIR/DEMO WORK NO LATER 5/5/17.WORK SIGNED OFF NO LATER 10/12/17

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01204467-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01204467-I1
BIN
2131339
BBL
2032340080
Review type
Professional Certification
Existing stories
1
Proposed stories
1
Existing dwelling units
0
Proposed dwelling units
0
General construction