NYC DOB record · X01223428-I1

2500 Johnson Avenue

2500 Johnson Avenue, Bronx, NY 10463

Alteration filing in Riverdale-Spuyten Duyvil, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 19, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01223428-I1

2500 Johnson Avenue

Bronx, NY 10463

Alteration filing · status dated Sep 16, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
340
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01223428-I1 as a alteration filing at 2500 Johnson Avenue, Bronx, NY 10463. Its latest published status category is Approved, dated Sep 16, 2026. The filing records 340 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 16, 2026
Proposed scale
340 proposed dwelling units
Applicant of recordSee the 211 filings that name Rigid Structural Design, LLC
FiledMay 22, 2025
Current recordApproved
Proposed scale340 units
Recorded cost$2,500

What the filing says

A public-record reading of the proposed work.

Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 20-story elevator apartment building built in 1967, with 339 homes, on a 68,125 sq ft lot.

Built
1967
Floors
20
Residential units
339
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
68,125 sq ft
Building area
466,400 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 99 notices on file; the most recent was issued Jun 17, 2026.

  • Construction

    Issued Jun 17, 2026 — FAILURE TO COMPLY W/COMMISSIOINER'S ORDER:DOB VIOLATION #011422CLL2080 1RF REQUIRED THE IMMEDIATE HANDS ON INSPECTION OF ALL FACADES BY A NYS LICENSED PROFESSIONAL.SUBMIT REPORT TO FACADES VIA EMAIL BY 02/14/2022 AS OF TODAY, NO HANDS ON INSPECTION REPORT SUBMITTED TO FACADE UNIT REMEDY:COMPLY WITH DOB VIOLATION #011422CLL20801RF IMMEDIATELY

  • Construction

    Issued May 29, 2024 — MULTIPLE HAZARDOUS CONDITIONS SUCH AS BALCONY SLAB,SPALLING,MISSING GA PS AT BALCONY RAILING,AND MOVEMENT IN GLASS AT BALCONY RAILINGS WAS DE TECTED IN MULTIPLE LOCATIONS.THESE CONDITIONS HAVE THEREFORE MADE ALL BALCONIES AND TERRACES AT EXP1 WEST ELEV AND EXP3 EAST ELEV UNABLE TO BE OCCUPIED.REMEDY:VACATE ALL BALCONIES AND TERRACES AT EXP1 AND 3

  • Fail to certify class

    Issued Apr 13, 2022 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • 4 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 18, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01223428-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01223428-I1
BIN
2083245
BBL
2057160500
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
340
Proposed dwelling units
340
Sidewalk shed