NYC DOB record · X01306826-I1

2500 Webb Avenue

2500 Webb Avenue, Bronx, NY 10468

Alteration filing in University Heights (North)-Fordham, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01306826-I1

2500 Webb Avenue

Bronx, NY 10468

Alteration filing · status dated Oct 19, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
57
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01306826-I1 as a alteration filing at 2500 Webb Avenue, Bronx, NY 10468. Its latest published status category is Approved, dated Oct 19, 2026. The filing records 57 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 19, 2026
Proposed scale
57 proposed dwelling units
Applicant of recordSee the 204 filings that name Mje Professional Services
FiledOct 22, 2025
Current recordApproved
Proposed scale57 units
Recorded cost$15,000

What the filing says

A public-record reading of the proposed work.

Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1924, with 57 homes, on a 13,000 sq ft lot.

Built
1924
Floors
5
Residential units
57
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
13,000 sq ft
Building area
60,133 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 21, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 11 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Immediate

    Issued Oct 7, 2025 — INSTALL SIDEWALK SHED FOR OVERHEAD PROTECTION WRAPPING THE CORNER WHER E EXPOSURE-1 & EXPOSURE-2 INTERSECT. INSTALL:APPROX 30 LINEAR FEET IN IN LENGTH TIGHT TO FACADE AT EXPOSURE 1 APPROXIMATELY 30 LINEAR FEET IN LENGTH TIGHT TO.FACADE AT EXPOSURE 2, .TO SAFEGUARD ALL PUBLIC & OCCUPANTS FROM FALLING DEBRIS

  • Construction

    Issued Oct 6, 2025 — FACADE CORNER LEFT OF BUILDING( EXPOSURE 2), RIGHT ( EXPOSURE 4) & FACADE IN COURT YARD ENTRY OVER DOOR TO RIGHT IS IN DISREPAIR WITH VERTICAL/HORIZONTAL CRACKS AND PEELING WITH MISSING WATER PROOFING, WILL BE A POTENTIAL DANGER DURING WEATHER INCREMENTS.

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01306826-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 83,982 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01306826-I1
BIN
2014837
BBL
2032200001
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
57
Proposed dwelling units
57
Sidewalk shed