What the filing says
A public-record reading of the proposed work.
Installation, relocation, replacement and removal of plumbing fixtures as shown on plans filed herewith.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 12-story elevator apartment building built in 1925, with 86 homes, on a 13,250 sq ft lot.
- Built
- 1925
- Last altered
- 1989
- Floors
- 12
- Residential units
- 86
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- C4-6A
- Lot area
- 13,250 sq ft
- Building area
- 132,975 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 69 notices on file; the most recent was issued Jun 2, 2025.
- Construction
Issued Jun 2, 2025 — STOP ALL ELECTRICAL WORK ON PERMIT # M00817513 AND M08011557 DUE TO THE EXPIRATION OF THE LICENSED ELECTRICIAN LICENSE # 012921 FIRM # 004803, ALL ELECTRICAL WORK ON THIS PERMIT MUST STOP AND A STOP WORK ORDER RESCISSION MUST BE REQUESTED THROUGH ELECTRICALSWO@BUILDINGS.NYC.GOV PRIOR TO RESUMING ANY WORK
- Failure to submit
Issued Apr 22, 2023 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)
- Elevator
Issued Oct 25, 2021
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00899205-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00899205-I1
- BBL
- 1012400010
- Postal code
- 10025 · 568 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 86
- Proposed dwelling units
- 86