NYC DOB record · B00469647-I1

2517 Clarendon Road

2517 Clarendon Road, Brooklyn, NY 11226

Alteration filing in East Flatbush-Erasmus, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00469647-I1

2517 Clarendon Road

Brooklyn, NY 11226

Alteration filing · status dated Dec 28, 2022

Current record
Approved
Proposed scale
4 stories
Dwelling units
3
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00469647-I1 as a alteration filing at 2517 Clarendon Road, Brooklyn, NY 11226. Its latest published status category is Approved, dated Dec 28, 2022. The filing records 4 proposed stories and 3 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Dec 28, 2022
Proposed scale
4 proposed stories and 3 proposed dwelling units
Complete building dossierView all 2 filings associated with BIN 3119056Applicant of recordSee the 12 filings that name Odaye DESIGN,P.E.,P.C.
FiledNov 2, 2021
Current recordApproved
Proposed scale4 stories
Recorded cost$80,000

What the filing says

A public-record reading of the proposed work.

Filing herewith rehabilitation of building front facade and restoration work of foundation to stabilize and enhance structural integrity of building. directive ii filing is herewith requested, no change in use, egress or occupancy under this filing.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story two-family home built in 1899, on a 1,600 sq ft lot.

Built
1899
Floors
2
Residential units
2
Building type
Two-family home
Land use
One and two family homes
Zoning district
R6
Lot area
1,600 sq ft
Building area
3,597 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 9 notices on file; the most recent was issued Dec 12, 2025.

  • Construction

    Issued Dec 12, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED ENTIRELY OUTER LAYER OF BRICK HAS BEEN REMOVED. LEAVING STRUCTURAL BRICK LOOSE, AND DEGRADED MORTAR JOINTS. ALSO OBSERVED DEFECTED ROOF CORNICE. REMEDY: REPAIR AND/OR REPLACE

  • Construction

    Issued Dec 23, 2020 — FTM BUILDING IN SAFE CONDITION.EXP#1,BRICK FACADE HAD STEP CRCKS & WAS BULG OUT ARND WINDWS&AT PIER NEAR GRADE.STONE SILLS&HEADRS WERE CRCK'D EXP#1 STONE HEADR HAD NON-ENGR'D SHORG IN PLACE W/OUT PRPER CONNCT&FDN SUPRT.EXP#1 STATE DISRPR.OWNR TO RETN A NYS PE TO EVAL ENTRE BLDG&PREP RPR PLNS-BLD TO BE RPR'D UNDR PRMT STRT BY 02/01/21 &CMPLT BY 02/26/21

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00469647-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00469647-I1
BBL
3051690035
Review type
Standard Plan Examination
Existing stories
4
Proposed stories
4
Existing dwelling units
3
Proposed dwelling units
3
Structural work