What the filing says
A public-record reading of the proposed work.
Application filed to install new ductwork, new kitchen exhaust fan, and make-up air fan for commercial kitchen as per plans. fire suppression system filedseparately with the fdny. no change to use, egress, oroccupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 17-story office building built in 1924, on a 9,131 sq ft lot.
- Built
- 1924
- Floors
- 17
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- M1-9A
- Lot area
- 9,131 sq ft
- Building area
- 139,629 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 36 open notices on record for this building, out of 189 notices on file; the most recent was issued Dec 1, 2024.
- Failure to post energy
Issued Dec 1, 2024 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
- Construction
Issued Sep 12, 2022 — EMERGENCY WORK ORDER DUE TO CRACKED/SPALLED CONCRETE SLABS AT FIRE ESCAPE LANDING FASCIA AT DIFFERENT LEVELS AND LOCATIONS AT EXPOSURE#1, COURTYARD.REMEDY IMMEDIATELY REPAIR FIRE ESCAPE CONCRETE SLABS AT EXPOSURE#1,COURTYARD.PROVIDE PLANS FOR REPAIRS BY 09/29/2022
- Hazardous condition (facade)
Issued May 27, 2022 — CYCLE 9A UNSAFE REPORT FILED
33 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01349410-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01349410-I1
- BIN
- 1014452
- BBL
- 1007860076
- Postal code
- 10018 · 267 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0