NYC DOB record · B01191258-I1

2525 Batchelder Street

2525 Batchelder Street, Brooklyn, NY 11235

Alteration filing in Sheepshead Bay-Manhattan Beach-Gerritsen Beach, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01191258-I1

2525 Batchelder Street

Brooklyn, NY 11235

Alteration filing · status dated Aug 31, 2026

Current record
Recorded as completed
Proposed scale
8 stories
Dwelling units
119
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01191258-I1 as a alteration filing at 2525 Batchelder Street, Brooklyn, NY 11235. Its latest published status category is Recorded as completed, dated Aug 31, 2026. The filing records 8 proposed stories and 119 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Aug 31, 2026
Proposed scale
8 proposed stories and 119 proposed dwelling units
The building, not the filingwhat it sold for and every filing at BIN 3320932Applicant of recordSee the 18 filings that name Sw Engineering Company
FiledJul 11, 2025
Current recordRecorded as completed
Proposed scale8 stories
Recorded cost$1.2M

What the filing says

A public-record reading of the proposed work.

General construction for existing roof membrane & insulation replacement at main & bulkhead roofs as per plans filed herewith. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 8-story elevator apartment building built in 1960, with 357 homes, on a 207,623 sq ft lot.

Built
1960
Floors
8
Residential units
357
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R3-2
Lot area
207,623 sq ft
Building area
408,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 8, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 21 open notices on record for this building, out of 40 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

  • 18 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 8, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01191258-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01191258-I1
BBL
3074490001
Review type
Standard Plan Examination
Existing stories
8
Proposed stories
8
Existing dwelling units
119
Proposed dwelling units
119
General construction