What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the NYC building code.live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story mainly residential with some commercial built in 1829, with 3 homes, on a 1,033 sq ft lot.
- Built
- 1829
- Last altered
- 1988
- Floors
- 4
- Residential units
- 3
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R7-2
- Lot area
- 1,033 sq ft
- Building area
- 2,608 sq ft
- Historic district
- Greenwich Village Historic District Extension II
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 17, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 7 notices on file; the most recent was issued Jan 14, 2026.
- Construction
Issued Jan 14, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED MISSING SIDING ON EXPOSURE 2 AND DAMAGED WINDOW FRAMES AND SPALLED/ SPALLING STUCCO EXPOSURE 3. REMEDY: REPAIR AND OR REPLACE
- Construction
Issued Sep 10, 2024 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AT TIME OF INS PECTION,IT WAS OBSERVED AT EXP1 BULDGING BRICKS ABOVE 4TH FLOOR LINTEL LINE.PARAPET WALL APPEARED TO BE BULDGING WITH A MISSING BRICK,A A BRO KEN COPING STONE AND AT 3RD FLOOR WINDOW LINTEL WAS CRACKED/BROKEN.REM EDY:REPAIR AND/OR REPLACE
- Construction
Issued Apr 4, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER. OBSERVED AT EXP 1 SOU ELEVATION DAMAGED COPING STONE, MISSING BRICK FACE & CRACKS, SPALLING & CORROSIONS OF FIRE ESCAPE EXP 2 N ELEV:MISSING/LOOSE SIDING EXP 3 EAST ELE. DAMAGE STUCCO,CRACK & BULGING. REMEDY: REPAIR AND OR REPLACE
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 17, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01268618-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 85,681 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01268618-I1
- BIN
- 1010066
- BBL
- 1005890009
- Postal code
- 10014 · 816 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 3
- Proposed dwelling units
- 3








