What the filing says
A public-record reading of the proposed work.
Installation of temporary sidewalk shed as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story walk-up apartment building built in 1928, with 24 homes, on a 2,581 sq ft lot.
- Built
- 1928
- Floors
- 6
- Residential units
- 24
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R8B
- Lot area
- 2,581 sq ft
- Building area
- 12,276 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 7 notices on file; the most recent was issued Jan 23, 2026.
- Construction
Issued Jan 23, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT TIME OF INSPE CTION,I OBSERVED CRACKING/SPALLING BRICKS,DEFECTED MORTAR JOINTS,BULGI NG WINDOW LINTEL BRICKS OF MULTI-LOCATIONSAT EXPOSURE 1 NORTH ELEVATIO N.REMEDY:REPAIR AND/OR REPLACE
- Construction
Issued Aug 19, 2025 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPMLIANT MANNER. NOTE: AT TIME OF INSPECTION OBSERVED MULTIPLE BRICK FACE CRACK AT MULTIPLE LEVELS AND STEPCRACKS/VERTICAL CRACKS IN BRICK WORK AT VARIOUS LEVELS REMEDY: REPAIR AND REPLACE
- Fail to certify class
Issued Oct 4, 2023 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00692020-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00692020-I1
- BIN
- 1013749
- BBL
- 1007640067
- Postal code
- 10011 · 340 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 24
- Proposed dwelling units
- 24