What the filing says
A public-record reading of the proposed work.
8th Cycle Facade Repair Program. No Change To Use, Egress Or Occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 12-story condominium built in 2008, with 32 homes, on a 9,435 sq ft lot.
- Built
- 2008
- Floors
- 12
- Residential units
- 32
- Building type
- Condominium
- Land use
- Elevator apartments
- Zoning district
- C4-4D
- Lot area
- 9,435 sq ft
- Building area
- 38,437 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 31 notices on file; the most recent was issued Feb 18, 2022.
- Failure to correct swarmp conditions (facade)
Issued Feb 18, 2022 — CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS
- (other bldgs types) - elevator affirmation of
Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
- (other bldgs types) - elevator affirmation of
Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00555934-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,085 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00555934-I1
- BIN
- 3020603
- BBL
- 3009647502
- Postal code
- 11215 · 4788 filings
- Review type
- Standard Plan Examination
- Existing stories
- 12
- Proposed stories
- 12
- Existing dwelling units
- 32
- Proposed dwelling units
- 32