NYC DOB record · S00895770-S8

2559 Forest Avenue

2559 Forest Avenue, Staten Island, NY 10303

New building filing in Mariner's Harbor-Arlington-Graniteville, Staten Island. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Nov 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · S00895770-S8

2559 Forest Avenue

Staten Island, NY 10303

New building · status dated Nov 10, 2026

Current record
Recorded as completed
Proposed scale
1 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing S00895770-S8 as a new building at 2559 Forest Avenue, Staten Island, NY 10303. Its latest published status category is Recorded as completed, dated Nov 10, 2026. The filing records 1 proposed story.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Recorded as completed
Latest status date
Nov 10, 2026
Proposed scale
1 proposed story
The building, not the filingopen housing violations, the owner of record and every filing at BIN 5176288Applicant of recordSee the 25 filings that name Ware Malcomb
FiledDec 12, 2024
Current recordRecorded as completed
Proposed scale1 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Herewith filing civil plumbing work as per plans

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 1-story garage or fuel station built in 2025, on a 278,835 sq ft lot.

Built
2025
Floors
1
Residential units
0
Building type
Garage or fuel station
Land use
Transportation and utility
Zoning district
M2-1
Lot area
278,835 sq ft
Building area
9,928 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 12, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing S00895770-S8.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,779 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
S00895770-S8
BBL
Empty in the source
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
1
Existing dwelling units
Empty in the source
Proposed dwelling units
0