What the filing says
A public-record reading of the proposed work.
Installation of heavy duty sidewalk shed as per plans. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 14-story office building built in 1924, on a 7,357 sq ft lot.
- Built
- 1924
- Floors
- 14
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- M1-9A
- Lot area
- 7,357 sq ft
- Building area
- 96,736 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 96 notices on file; the most recent was issued Apr 25, 2024.
- Construction
Issued Apr 25, 2024 — FAILURE TO MAINTAIN BUILDINGS IN A CODE COMPLIANT MANNER.AS NOTED AT T IME OF INSPECTION I OBSERVED ON EXP3 SOUTH ELEVATION BALCONIES WITH SP ALLING SLABS ON MULTIPLE FLOORS.REMEDY:REPAIR AND/OR REPLACE BALCONY S LABS
- Facade safety program
Issued Jan 2, 2018
- Elevator
Issued Dec 3, 2010
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 11, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00007892-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00007892-I1
- BBL
- 1007870072
- Postal code
- 10018 · 267 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source