What the filing says
A public-record reading of the proposed work.
Removal and relocation of interior non-load bearing partitions, floor, wall & ceiling finishes at sub-cellar, cellar, & first floor north commercial & storage spaces, escalator, stair & elevators in same. No change in occupancy use or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 35-story condominium built in 1983, with 301 homes, on a 37,843 sq ft lot.
- Built
- 1983
- Floors
- 35
- Residential units
- 301
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C4-6A
- Lot area
- 37,843 sq ft
- Building area
- 395,377 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 124 notices on file; the most recent was issued Apr 29, 2021.
- Failure to post energy
Issued Apr 29, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
- Elevator annual inspection /
Issued Sep 15, 2017 — VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
- Elevator annual inspection /
Issued Mar 31, 2014 — VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
5 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00653819-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00653819-I1
- BIN
- 1056068
- BBL
- 1018687501
- Postal code
- 10025 · 229 filings
- Review type
- Professional Certification
- Existing stories
- 31
- Proposed stories
- 31
- Existing dwelling units
- 302
- Proposed dwelling units
- 302








