What the filing says
A public-record reading of the proposed work.
This is an administrative-only filing, to supersede previously-permitted work under appl. #320755937 from 2013, which was never signed off. work in unit 2, 1st and 2nd floors, no change to egress, use, or occ.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story walk-up apartment building built in 1889, with 3 homes, on a 2,000 sq ft lot.
- Built
- 1889
- Floors
- 4
- Residential units
- 3
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R6B
- Lot area
- 2,000 sq ft
- Building area
- 3,680 sq ft
- Historic district
- Bedford Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 19 notices on file; the most recent was issued Feb 4, 2025.
- Construction
Issued Feb 4, 2025 — BOROUGH COMMISSIONER HAS STOPPED ALL WORK ON 02/04/25 FOR APPLICATION #320755937 DUE TO APPLICANT WITHDRAWAL.
- Construction
Issued Feb 4, 2025 — BOROUGH COMMISSIONER HAS STOPPED ALL WORK ON 02/04/25 FOR APPLICATION #320755937 DUE TO APPLICANT WITHDRAWAL.
- Construction
Issued Feb 4, 2025 — BOROUGH COMMISSIONER HAS STOPPED ALL WORK ON 02/04/25 FOR APPLICATION #320715366 DUE TO APPLICANT WITHDRAWAL.
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01376298-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01376298-I1
- BIN
- 3052304
- BBL
- 3018330037
- Postal code
- 11216 · 2334 filings
- Review type
- Professional Certification
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 3
- Proposed dwelling units
- 3