NYC DOB record · B00550452-I1

259 21 Street

259 21 Street, Brooklyn, NY 11215

Alteration filing in Sunset Park (West), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00550452-I1

259 21 Street

Brooklyn, NY 11215

Alteration filing · status dated Aug 24, 2022

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
33
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00550452-I1 as a alteration filing at 259 21 Street, Brooklyn, NY 11215. Its latest published status category is Recorded as completed, dated Aug 24, 2022. The filing records 33 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Aug 24, 2022
Proposed scale
33 proposed dwelling units
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 3017415Applicant of recordSee the 19 filings that name Ejz Engineering
FiledJul 13, 2021
Current recordRecorded as completed
Proposed scale33 units
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Provide new connection to existing sewer piping for new bathrooms. Provide new piping from new electric hot water heater to new bathrooms.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story condominium built in 2006, with 37 homes, on a 17,883 sq ft lot.

Built
2006
Floors
5
Residential units
37
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
R6B
Lot area
17,883 sq ft
Building area
50,354 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 36 notices on file; the most recent was issued Jan 20, 2021.

  • Fail to certify class

    Issued Jan 20, 2021 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • (other bldgs types) - elevator affirmation of

    Issued Jan 26, 2018 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

  • (other bldgs types) - elevator affirmation of

    Issued Jan 3, 2017 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST

  • 4 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00550452-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00550452-I1
BBL
3008917501
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
34
Proposed dwelling units
33
plumbing