NYC DOB record · M01204753-I1

259 West 126 Street

259 West 126 Street, Manhattan, NY 10027

Alteration filing in Harlem (North), Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 17, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01204753-I1

259 West 126 Street

Manhattan, NY 10027

Alteration filing · status dated Sep 14, 2026

Current record
Approved
Proposed scale
3 stories
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01204753-I1 as a alteration filing at 259 West 126 Street, Manhattan, NY 10027. Its latest published status category is Approved, dated Sep 14, 2026. The filing records 3 proposed stories and 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 14, 2026
Proposed scale
3 proposed stories and 1 proposed dwelling unit
Applicant of recordSee the 2 filings that name Rodney Leon Architect PLLC
FiledJun 3, 2025
Current recordApproved
Proposed scale3 stories
Recorded cost$250,000

What the filing says

A public-record reading of the proposed work.

Repair of existing church.facade restoration & replacement of existing windows at exterior.new partitions at existing church meeting room, sanctuary, and apartment. all work as per plans.to comply with vacate order. no change to use, egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story place of worship built in 1920, on a 1,998 sq ft lot.

Built
1920
Last altered
1983
Floors
2
Residential units
0
Building type
Place of worship
Land use
Public facilities and institutions
Zoning district
R7-2
Lot area
1,998 sq ft
Building area
2,970 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 5 notices on file; the most recent was issued Apr 24, 2023.

  • Construction

    Issued Apr 24, 2023 — FTM.FULL VACATE.2 STORY EXP1 PARAPET AT 1/4 CRNR W/SEVERCRCK WRAPPED AROUND EXP1&4 W/EXP1 PRTLLY DETACHED&BULGING,POSING ARISK TO PUBLIC& ADJ PS154 SCHOOL YRD.EXP1&EXP4 STUCCO CRCKD@VARIOUS LCN.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER#341044(012723FEU11001PN)DATED JANUARY 27,2023

  • Unsafe

    Issued Feb 2, 2023

  • Construction

    Issued Jan 27, 2023 — FTM.FULL VACATE.2 STORY EXP1 PARAPET AT 1/4 CRNR W/SEVERE CRCK AROUND EXP1&4 W/ EXP1 PRTLLY DETACHED&BULGING,POSING A RISK TO PUBLIC&ADJ PS154 SCHOOL YRD.EXP1&EXP4 STUCCO CRCKD@VARIOUS LCN. FULLY VACATE PROPERTY.OWNR TO RETAIN NYS PE TO EVAL ENT BLDG&REPAIR BLDG UNDR PRMT SRTING BY 3/1/23& BE CMPLTD BY 4/7/23

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01204753-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01204753-I1
BIN
1058670
BBL
1019320009
Review type
Standard Plan Examination
Existing stories
3
Proposed stories
3
Existing dwelling units
1
Proposed dwelling units
1
General construction