NYC DOB record · M08019018-I1

26 Wall Street

26 Wall Street, Manhattan, NY 10005

Alteration filing in Financial District-Battery Park City, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 10, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M08019018-I1

26 Wall Street

Manhattan, NY 10005

Alteration filing · status dated Oct 7, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M08019018-I1 as a alteration filing at 26 Wall Street, Manhattan, NY 10005. Its latest published status category is Approved, dated Oct 7, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 7, 2026
Proposed scale
Not stated in this filing
Applicant of recordSee the 176 filings that name Brand Access Solutions
FiledOct 12, 2022
Current recordApproved
Proposed scaleNot specified
Recorded cost$50,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary system scaffold as per drawings. system scaffold shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2.75-story place of public assembly built in 1842, on a 17,200 sq ft lot.

Built
1842
Floors
2.75
Residential units
0
Building type
Place of public assembly
Land use
Public facilities and institutions
Zoning district
C5-5
Lot area
17,200 sq ft
Building area
23,199 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M08019018-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M08019018-I1
BIN
1001020
BBL
1000430006
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0
Scaffolding