What the filing says
A public-record reading of the proposed work.
Proposed renovation at existing commercial space for an eating & drinking establishment at the first floor level. no change in use, egress and occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 12-story condominium built in 1911, with 96 homes, on a 19,710 sq ft lot.
- Built
- 1911
- Floors
- 12
- Residential units
- 96
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- R9A
- Lot area
- 19,710 sq ft
- Building area
- 150,289 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 41 notices on file; the most recent was issued Jun 26, 2024.
- Fail to certify class
Issued Jun 26, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Construction
Issued Nov 10, 2021 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER 322185(2320LL10702OS) IISUED ON 02/03/2020. AS OF 11/10/2021 OWNER HAS NOT COMPLIED WITH IMMEDIATE CURE ORDER. REMEDY: IMMED COMPLY WITH CODE AND COMMISSIONERS ORDERS
- Construction
Issued Jun 9, 2021 — FAILURE TO COMPLY. ON 09/17/2020 COMMISSIONER'S ORDER 349463 (091720CLLFA01RF)WAS ISSUED TO OWNER TO HAVE ENTIRE CORNICE 100% INSPECTED BY A NYS LIC PROF ENG'R. AS OF 06/09/2021 OWNER HAS NOT COMPLIED W/IMMED CURE ORDER TO HAVE ENTIRE CORNICE INSPECTED & PROVIDE REPORT & REPAIR PROPOSAL & PERMIT. REMEDY:IMMED COMPLY W/COMM ORDER
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00788171-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 69,387 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00788171-I1
- BBL
- 1018707502
- Postal code
- 10025 · 338 filings
- Review type
- Professional Certification
- Existing stories
- 8
- Proposed stories
- 8
- Existing dwelling units
- 27
- Proposed dwelling units
- 27








