What the filing says
A public-record reading of the proposed work.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story office building built in 1857, on a 17,961 sq ft lot.
- Built
- 1857
- Floors
- 6
- Residential units
- 2
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- M1-5/R9X
- Lot area
- 17,961 sq ft
- Building area
- 103,047 sq ft
- Historic district
- SoHo-Cast Iron Historic District Extension
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 17 open notices on record for this building, out of 120 notices on file; the most recent was issued Nov 14, 2025.
- High pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
- High pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
- Construction
Issued Oct 23, 2025 — FTC W/COMMISSIONER'S ORDER CONTROL#347825 VIO#081125PI10201SB DATED 8/11/25 REQURING OWNET TP PROVIDE A CORRECTIVE ACTION PLAN BY 9/11/25 & START BLDG REPRS UNDER PERMIT BY 10/11/25 AS OF 10/23/25 A CAP AND EVIDENCE WAS NOT REC'D. IMMED COMPLY W/COMSSIONER'S ORDER CONTROL# 347825 VIO#081125PI10201SB TO PROVIDE A CORRECTIVE ACTION PLAN
14 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01271357-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01271357-I1
- BBL
- 1002090028
- Postal code
- 10013 · 279 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 2
- Proposed dwelling units
- 2