What the filing says
A public-record reading of the proposed work.
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter # 33 of the NYC code 2022, no changes in use egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1915, with 26 homes, on a 7,603 sq ft lot.
- Built
- 1915
- Floors
- 5
- Residential units
- 26
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R6
- Lot area
- 7,603 sq ft
- Building area
- 24,210 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 24 open notices on record for this building, out of 24 notices on file; the most recent was issued Oct 5, 2026.
- Immediate
Issued Oct 5, 2026 — REMEDY: INSTALL APPROXIMATELY 74 LINEAR FEET OF SHED AT EXPOSURE 1 FRONT OF BUILDING MEASUREMENT INCLUDES 5 EXTENSION AS PER CODE AND RETURN APPROXIMATELY 30 LINEAR FEET TO FRONT ENTRANCE OF BUILDING AT CENTER OF BUILDING
- Low pressure boiler
Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
- Low pressure boiler
Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
21 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01470656-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01470656-I1
- BIN
- 2014402
- BBL
- 2032020053
- Postal code
- 10468 · 205 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 26
- Proposed dwelling units
- 26