What the filing says
A public-record reading of the proposed work.
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story condominium built in 1896, with 53 homes, on a 19,983 sq ft lot.
- Built
- 1896
- Last altered
- 1997
- Floors
- 5
- Residential units
- 53
- Building type
- Condominium
- Land use
- Walk-up apartments
- Zoning district
- R7-2
- Lot area
- 19,983 sq ft
- Building area
- 56,180 sq ft
- Historic district
- Dorrance Brooks Square Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 17 open notices on record for this building, out of 17 notices on file; the most recent was issued Dec 13, 2011.
- Low pressure boiler
Issued Dec 13, 2011 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
- Low pressure boiler
Issued Dec 31, 2009
- Local law 62/91 - boilers
Issued Jan 1, 2009
14 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01427130-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 83,050 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01427130-I1
- BIN
- 1085453
- BBL
- 1020427502
- Postal code
- 10030 · 177 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 53
- Proposed dwelling units
- 53