What the filing says
A public-record reading of the proposed work.
Install new commercial cooking equipments and plumbing fixtures as per plan, no change to use , egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story store building built in 1928, on a 2,000 sq ft lot.
- Built
- 1928
- Floors
- 2
- Residential units
- 2
- Building type
- Store building
- Land use
- Mixed residential and commercial
- Zoning district
- R4
- Lot area
- 2,000 sq ft
- Building area
- 3,400 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 17 notices on file; the most recent was issued Dec 21, 2023.
- Construction
Issued Dec 21, 2023 — AC28-301.1; AC28-116.2.2; AC28-104.7.11, UNPERMITD DEMO OF EXP#3WALL @ 2NDFL,CAUSNG UNBRACD WALL CONDTN@EXP#2&PARTIAL VACATE POSES POTENTIAL HAZARD TO PUBLIC AND PROPERTY. REMEDY: COMPLY W CODE,RETAIN NYS PE TO PERFM DAILY STRCT STAB INSP PER AC 28-116.2.2 1ST INSP BY12/17,SUBMT SIGNED/SEALED RPT BY12/19,SUBMIT STABILITY PLANS BY 12/20/2023
- Construction
Issued Dec 12, 2023 — AC 28-104.7.11; AC 28-301.1 UNPERMITD DEMO OF EXP#3 WALL@2NDFL.CAUSING UNBRACD WALL CONDTN@EXP#2&PARTIAL VACATE.UNPERMTD DEMO OF STRUCTL LOAD BEARING ELEMNTS IS A POTENTIAL HAZARD2PUBLIC&PROPERTY. REMEDY: COMPLY W CODE,RETAIN NYS RDP FOR PERM STRUCTURAL REPAIRS.PRE-FILE BY 12/19,SUBMT PLNS BY 12/22&WRK UNDR PERMT BY 12/29/23
- Construction
Issued Dec 12, 2023 — AC28-301.1; AC28-116.2.2; AC28-104.7.11, UNPERMITD DEMO OF EXP#3WALL@ 2NDFL,CAUSNG UNBRACD WALL CONDTN@EXP#2&PARTIAL VACATE POSES POTENTIAL HAZARD TO PUBLIC AND PROPERTY. REMEDY: COMPLY W CODE,RETAIN NYS PE 2 PERFM DAILY STRUCTURAL STABILITY INSPECTIONS PER AC 28-116.2.2 1ST INSP BY12/17,SUBMT S/S RPT BY12/19,SUBMIT PLANS BY 12/20/23
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00321368-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00321368-I1
- BBL
- 3074710010
- Postal code
- 11235 · 1852 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 2
- Proposed dwelling units
- 2