What the filing says
A public-record reading of the proposed work.
Filing herewith for underground plumbing as per plans.
Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story elevator apartment building built in 2024, with 147 homes, on a 70,847 sq ft lot.
- Built
- 2024
- Floors
- 5
- Residential units
- 147
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6B
- Lot area
- 70,847 sq ft
- Building area
- 245,091 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 11 open notices on record for this building, out of 27 notices on file; the most recent was issued Sep 23, 2024.
- Low pressure boiler
Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
- Low pressure boiler
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
- Low pressure boiler
Issued Apr 25, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
8 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00656247-S8.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00656247-S8
- BBL
- 3010530020
- Postal code
- 11215 · 4379 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- 5
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- 144