NYC DOB record · B00500172-I1

2630 Cropsey Avenue

2630 Cropsey Avenue, Brooklyn, NY 11214

Alteration filing in Gravesend (South), Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00500172-I1

2630 Cropsey Avenue

Brooklyn, NY 11214

Alteration filing · status dated Jul 1, 2021

Current record
Approved
Proposed scale
Not stated
Dwelling units
364
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00500172-I1 as a alteration filing at 2630 Cropsey Avenue, Brooklyn, NY 11214. Its latest published status category is Approved, dated Jul 1, 2021. The filing records 364 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Jul 1, 2021
Proposed scale
364 proposed dwelling units
Complete building dossierView all 3 filings associated with BIN 3336512Applicant of recordSee the 199 filings that name Bazini Engineering, P.C.
FiledJun 24, 2021
Current recordApproved
Proposed scale364 units
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

The public record does not include a detailed scope description.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 17-story elevator apartment building built in 1963, with 325 homes, on a 102,330 sq ft lot.

Built
1963
Floors
17
Residential units
325
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
102,330 sq ft
Building area
421,800 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 33 notices on file; the most recent was issued Mar 19, 2026.

  • Construction

    Issued Mar 19, 2026 — THE DEPARTMENT OF BUILDINGS UNDER SECTION 28-207.2 ORDERS THAT YOU TOP ALL WORK UNDER PERMIT # B01081539-I1 ON 11/13/25. STOP ALL WORK IMMEDIATELY AND MAKE SITE SAFE.

  • Construction

    Issued Mar 19, 2026 — THE DEPARTMENT OF BUILDINGS UNDER SECTION 28-207.2 ORDERS THAT YOU TOP ALL WORK UNDER PERMIT # B01081539-I1 ON 11/13/25. DUE TO CONSTRUCTION SUPERINTENDENT WITHDRAWAL. STOP ALL WORK IMMEDIATELY AND MAKE SITE SAFE.

  • Elevator

    Issued Jul 21, 2021

  • 1 further open notice is on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 2, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00500172-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00500172-I1
BBL
3069330055
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
364
Proposed dwelling units
364