What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2014 code.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1940, with 48 homes, on a 11,156 sq ft lot.
- Built
- 1940
- Floors
- 6
- Residential units
- 48
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7A
- Lot area
- 11,156 sq ft
- Building area
- 53,530 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 21 open notices on record for this building, out of 41 notices on file; the most recent was issued Feb 22, 2024.
- No report and / or late filing (facade)
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
- Immediate
Issued Dec 29, 2023 — PROVIDE APPROX. 115' LINEAR FEET OF SIDEWALK SHED AT EXPOSURE 2 SOUTH ELEVATION WITH 5' LINEAR FEET EXTENDED PAST BUILDINGS SOUTH WEST ELEVATION CORNER
- Construction
Issued Dec 6, 2023 — EMERGENCY WORK ORDER DUE TO UNSAFE CONDITION ON EXPOSURE#2.CRACKED MOR MORTAR JOINTS AND BULGING BRICK WORK BY WINDOW ON THE 6TH FLR CORNER OF EXP#3.ALSO CRACKED BROKEN WIND.PANES ON THE SAME EXPO.ON THE 5TH FLR FINALLY STEP CRACKING COMING FROM THE WIND.ON THE 6TH FL.REMEDY: IMMED.PROV.APPROVED SAFETY MEASURES&REPAIR DEFECT UNDER SUPV.LIC.PROF
18 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00420008-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00420008-I1
- BIN
- 3199767
- BBL
- 3073520039
- Postal code
- 11229 · 1563 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 48
- Proposed dwelling units
- 48