NYC DOB record · B01352987-I1

2635 East 23 Street

2635 East 23 Street, Brooklyn, NY 11235

Full demolition filing in Sheepshead Bay-Manhattan Beach-Gerritsen Beach, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedFull demolition

NYC Department of Buildings · w9ak-ipjd · accessed Oct 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01352987-I1

2635 East 23 Street

Brooklyn, NY 11235

Full demolition · status dated Oct 28, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01352987-I1 as a full demolition at 2635 East 23 Street, Brooklyn, NY 11235. Its latest published status category is Approved, dated Oct 28, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Full demolition
Latest status
Approved
Latest status date
Oct 28, 2026
Proposed scale
Not stated in this filing
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 3205176Applicant of recordSee the 115 filings that name Yaker Engineering, P.C.
FiledFeb 20, 2026
Current recordApproved
Proposed scaleNot specified
Recorded cost$80,000

What the filing says

A public-record reading of the proposed work.

Full demolition of the partially built accessory to Church building, filed and built under NB #310175878. This NB application was not signed off.

Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story place of worship built in 2012, on a 10,533 sq ft lot.

Built
2012
Floors
3
Residential units
0
Building type
Place of worship
Land use
Public facilities and institutions
Zoning district
R4
Lot area
10,533 sq ft
Building area
7,919 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 29, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Nov 30, 2018.

  • Construction

    Issued Nov 30, 2018 — EMGWRK:1S+C DET W/F CHURCH 2ND BLDG@ROOF UNDER CONST DMG BY FIRE ON 11/29/18 80%ROOF/BRND COLL.ROOF TRUSSES IN PLACE STRUCT COMPRO ERECT ROOF/BRND/BELL FALLEN 1/2 W/DOWN 1ST/FL@EXP 3/4 FULL PENERTR/BLDG UNST DANGER/PUBLIC/PROP U/CONST DOB#11291831501IK REMEDY:DEM BLDG DOB REGIS CONTR WRK/SUPV/BY NYS& COMMENCE 12/4/18 FILE FOR PRMT W/IN 2 BUS DAYS

  • Construction

    Issued Nov 29, 2018 — EWRK,1S+C DET W/F CHURCH,2/BLDG@REAR LOT U/CONST.CHRCH DMGBYFIRE 11/29 18,80%ROOF BURN/COLL,STAP/ERET BUT/ROOF BRND,BELL FALL 1/2 WAY DN CELL FLOODED 1'-2'W/WAT.BLDG U/STAB DANG.REMEDY:IMM SEC SITE W/TB FEN,FILE PER W/2DYS RET.NYS PE&CONTR.F/DEMO TOBRACE,SHORE/STAB BLDG,REM DEBR/WA TER.WRK BEGN IMMD U/FDNY REQS.FILE PERMT OF ENG/WRK W/IN BUSINESS DAYS

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 29, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01352987-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,832 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01352987-I1
BBL
3074680080
Review type
Standard Plan Examination
Existing stories
3
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
Empty in the source