What the filing says
A public-record reading of the proposed work.
Installation of suspended scaffold & material hoist for exterior facade repairs and facade inspection. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 NYC bc. no change in use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 14-story elevator apartment building built in 1950, with 929 homes, on a 375,000 sq ft lot.
- Built
- 1950
- Floors
- 14
- Residential units
- 929
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 375,000 sq ft
- Building area
- 954,414 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 16 notices on file; the most recent was issued Jul 7, 2025.
- Plumbing
Issued Jul 7, 2025 — BASED ON LMP# 1343 BEING INACTIVE, STOP ALL PLUMBING WORK UNDER JOB# 200508691
- Failure to correct swarmp conditions (facade)
Issued Feb 21, 2022 — NYCHA CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS
- Hazardous condition (facade)
Issued Feb 21, 2022 — NYCHA CYCLE 9A UNSAFE REPORT FILED
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01238485-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01238485-I1
- BBL
- 2023250001
- Postal code
- 10451 · 140 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source