What the filing says
A public-record reading of the proposed work.
Window lintel replacement, brick veneer reconstruction, brick re-pointing, and window sill replacement as per plan.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1951, with 120 homes, on a 54,405 sq ft lot.
- Built
- 1951
- Floors
- 6
- Residential units
- 120
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R5
- Lot area
- 54,405 sq ft
- Building area
- 98,300 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 16 open notices on record for this building, out of 52 notices on file; the most recent was issued Jun 4, 2025.
- Construction
Issued Jun 4, 2025 — THE APPLICANT OF RECORD FOR JOB # 320266127 HAS INFORMED THE DEPARTMENT THAT SHE OR HE HAS WITHDRAWN FROM THE PROJECT. APPLICATION FAILS TO SET FORTH FULL NAME, ADDRESS, PHONE NUMBER, EMAIL ADDRESS OF APPLICANT IN VIOLATION OF SECTION 28-104.8.3. UNTIL SUCH INFORMATION IS PROVIDED, YOU ARE ORDERED TO STOP ALL WORK IMMEDIATELYAND MAKE THE
- No report and / or late filing (facade)
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
- Fail to certify class
Issued Jun 23, 2021 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
13 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00573222-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00573222-I1
- BBL
- 3072330021
- Postal code
- 11223 · 1782 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 120
- Proposed dwelling units
- 120








