What the filing says
A public-record reading of the proposed work.
Installation of outrigger platform in accordance with nycc 2022 chapter 33 building code. no change in egress, use, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a elevator apartment building built in 2025, with 229 homes, on a 5,017 sq ft lot.
- Built
- 2025
- Residential units
- 229
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- C4-4D
- Lot area
- 5,017 sq ft
- Building area
- 168,748 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 10 notices on file; the most recent was issued Jun 19, 2020.
- Construction
Issued Jun 19, 2020 — FAILURE TO COMPLY WITH COMMISH ORDER#322395 12/13/19 REQUIRING OWNER TO REMOVE DEBRIS ON LOW ROOF AND RETAIN NYSPE TO EVALUATE ENTIRE BLDG AND PREPARE REPAIR DRWGS.BLDG REPAIRS TO START BY 1/20/20 & BE COMPLET BY 3/27/20 UNDER PERMIT.NO PRMT FOR REPAIRS WORK HAS BEEN OBTAINED AS OF 6/19/20.IMMEDIATE COMPLY WITH COMMISSIONER'S ORDR# 121319FEU30505PN
- Construction
Issued Dec 13, 2019 — FAILURE TO MAINTAIN-DUE TO FIRE-1/19/19,BLDG VARIOUS ROOF OPENINGS, INADEQ SEAL,COMPROMISED FIRE SEPARATION BTWN 2681/2679,MODERATE DMG @ ROOF FRAMING WALLS @ 2&3FL & EXP3 WALL. EXCESS DEBRIS STORED IN 1STRY REAR ROOF EXT.OWNER REMOVE DEBRIS-LOW ROOF & RETN PE EVAL ENTIRE BLDG &PREP RPR DRWGS.RPRS STRT UNDR PRMT 1/20/20-COMPLETE BY 3/27/20
- Construction
Issued Jan 19, 2019 — DUE TO FIRE
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 11, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01338715-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01338715-I1
- BBL
- 3036710038
- Postal code
- 11207 · 3228 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 2
- Proposed dwelling units
- 0