What the filing says
A public-record reading of the proposed work.
Install NEW DEP antenna site. Install (2) antennas on bulkhead. Install (1) DCU cabinet on roof at bulkhead and (1) related solar panel on bulkhead. No change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 13-story warehouse built in 1909, on a 13,283 sq ft lot.
- Built
- 1909
- Last altered
- 1981
- Floors
- 13
- Residential units
- 0
- Building type
- Warehouse
- Land use
- Industrial and manufacturing
- Zoning district
- C6-2
- Lot area
- 13,283 sq ft
- Building area
- 170,266 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 63 notices on file; the most recent was issued May 30, 2014.
- (other bldgs types) - elevator affirmation of
Issued May 30, 2014 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
- (other bldgs types) - elevator affirmation of
Issued May 30, 2014 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
- No report and / or late filing (facade)
Issued Dec 31, 2013 — FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00305236-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
- Current status updated05
The latest recorded filing status is “LOC Issued.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00305236-I1
- BBL
- 3001220010
- Postal code
- 11201 · 5544 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0