NYC DOB record · X01417921-I1

2698 Bailey Avenue

2698 Bailey Avenue, Bronx, NY 10463

Alteration filing in University Heights (North)-Fordham, Bronx. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 22, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01417921-I1

2698 Bailey Avenue

Bronx, NY 10463

Alteration filing · status dated Oct 20, 2026

Current record
Recorded as completed
Proposed scale
6 stories
Dwelling units
71
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01417921-I1 as a alteration filing at 2698 Bailey Avenue, Bronx, NY 10463. Its latest published status category is Recorded as completed, dated Oct 20, 2026. The filing records 6 proposed stories and 71 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Oct 20, 2026
Proposed scale
6 proposed stories and 71 proposed dwelling units
Applicant of recordSee the 336 filings that name Arquitectura Varela
FiledJun 19, 2026
Current recordRecorded as completed
Proposed scale6 stories
Recorded cost$13,000

What the filing says

A public-record reading of the proposed work.

Install new fire rated ceiling in kitchen area of apartment 1a as per plans.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1930, with 71 homes, on a 10,000 sq ft lot.

Built
1930
Last altered
1984
Floors
6
Residential units
71
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
10,000 sq ft
Building area
42,240 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 33 notices on file; the most recent was issued Mar 5, 2026.

  • Construction

    Issued Mar 5, 2026 — STRUCTURE RENDERED NON COMPLIANT AT TIME OF INSPECTION OBSERVED AT APT .A1 SMOKE , FIRE AND WATER DAMAGE AT KITCHEN AREA. WITH MINOR SMOKE AN D WATER DAMAGE THORUGHOUT WITH ALL WINDOWS OUT STRUCTURE MUST BE MAINTAINED IN CODE COMPLIANT MANNER

  • No report and / or late filing (facade)

    Issued May 31, 2018 — FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017

  • No report and / or late filing (facade)

    Issued Jan 31, 2013 — FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01417921-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01417921-I1
BIN
2015173
BBL
2032390037
Review type
Standard Plan Examination
Existing stories
6
Proposed stories
6
Existing dwelling units
71
Proposed dwelling units
71
General construction