NYC DOB record · Q01281841-I1

271-11 76 Avenue

271-11 76 Avenue, Queens, NY 11005

Alteration filing in Glen Oaks-Floral Park-New Hyde Park, Queens. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 7, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01281841-I1

271-11 76 Avenue

Queens, NY 11005

Alteration filing · status dated Oct 5, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
52
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01281841-I1 as a alteration filing at 271-11 76 Avenue, Queens, NY 11005. Its latest published status category is Approved, dated Oct 5, 2026. The filing records 52 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 5, 2026
Proposed scale
52 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 4173982Applicant of recordSee the 370 filings that name Loring Consulting Engineers, INC.
FiledSep 8, 2025
Current recordApproved
Proposed scale52 units
Recorded cost$250,000

What the filing says

A public-record reading of the proposed work.

Provide new dryer exhaust to the exterior for new dryers. Provide AC units for cooling to all spaces. Provide new low-pressure steam to new equipment as required.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 8-story health facility built in 1970, on a 130,785 sq ft lot.

Built
1970
Floors
8
Residential units
0
Building type
Health facility
Land use
Public facilities and institutions
Zoning district
R3-2
Lot area
130,785 sq ft
Building area
356,093 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 22 open notices on record for this building, out of 159 notices on file; the most recent was issued Feb 22, 2023.

  • No report and / or late filing (facade)

    Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023

  • Failure to post energy

    Issued Dec 1, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Failure to post energy

    Issued Apr 29, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • 19 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01281841-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01281841-I1
BBL
4085200175
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
52
Proposed dwelling units
52