NYC DOB record · B00462069-I1

273 Macon Street

273 Macon Street, Brooklyn, NY 11216

Alteration filing in Bedford-Stuyvesant (East), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00462069-I1

273 Macon Street

Brooklyn, NY 11216

Alteration filing · status dated Aug 10, 2022

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00462069-I1 as a alteration filing at 273 Macon Street, Brooklyn, NY 11216. Its latest published status category is Recorded as completed, dated Aug 10, 2022. The filing records 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Aug 10, 2022
Proposed scale
1 proposed dwelling unit
Applicant of recordSee the 511 filings that name Enthink Engineering LLC
FiledMar 11, 2021
Current recordRecorded as completed
Proposed scale1 units
Recorded cost$4,000

What the filing says

A public-record reading of the proposed work.

Mechanical application filed for ventilation in bathrooms and Kitchen as per plan.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story walk-up apartment building built in 1873, with 3 homes, on a 2,000 sq ft lot.

Built
1873
Floors
3
Residential units
3
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6B
Lot area
2,000 sq ft
Building area
3,200 sq ft
Historic district
Bedford Stuyvesant / Expanded Stuyvesant Heights Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 8 notices on file; the most recent was issued Jun 30, 2023.

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION

  • 1 further open notice is on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00462069-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00462069-I1
BIN
3053210
BBL
3018470075
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
1
Proposed dwelling units
1