What the filing says
A public-record reading of the proposed work.
Filed herewith for plumbing work in apartments 2o,3l,4m,4w,5b,7q & 7x no change to use egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story elevator apartment building built in 1920, with 75 homes, on a 41,196 sq ft lot.
- Built
- 1920
- Last altered
- 2017
- Floors
- 7
- Residential units
- 75
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- M1-2
- Lot area
- 41,196 sq ft
- Building area
- 184,411 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 38 notices on file; the most recent was issued Jun 26, 2025.
- Construction
Issued Jun 26, 2025 — PARTIAL VACATE ORDER-ENTIRE PARKING GARAGE @ CELLAR LEVEL:THE PARKING GARAGE EXHIBITS SUBSTANIAL DELETERIOUS MATERIAL, INCLUDING MULT LARGE SECTIONS OF REINFORCED CONCRETE SLABS W/SIGNIFICANT SECTIONS OF SPALLED CONCRETE. VACATE ENTIRE PARKING GARAGE AT CELLAR LEVEL
- Construction
Issued Jun 23, 2025 — EMERGENCY WORK.AS NOTED AT TIME OF INSPECTION ON AN OCCUPIED PARKING STRUCTURE OBSRVD@VARIOUS LOCATIONS CRCKD CONCRETE BEAMS & COLUMNS RUSTNG METAL DECK,EXPOSD REINFORCMNT&MISSNG FIREPROOFNG MATERIAL.OWNR TO TRAIN A NYS REG DSGN PROFSSNL TO DRCT&SPRVSE THE IMMED INSTALLATION OF SFTY MEASURES&PRVDE SHORNG TO FAILD STRCTRL ELEMENTS
- Plumbing
Issued Jun 13, 2025 — UNABLE TO VERIFY WORK DONE UNDER LAA #B01231100 DUE TO NO ACCESS AND UNRESPONSIVE AUDIT OBJECTIONS. 0% WORK DONE
3 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00319875-P1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00319875-P1
- BBL
- 3018740001
- Postal code
- 11205 · 1661 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 125
- Proposed dwelling units
- 125