NYC DOB record · B00613348-I1

2750 Homecrest Avenue

2750 Homecrest Avenue, Brooklyn, NY 11235

Alteration filing in Sheepshead Bay-Manhattan Beach-Gerritsen Beach, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00613348-I1

2750 Homecrest Avenue

Brooklyn, NY 11235

Alteration filing · status dated Aug 6, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
168
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00613348-I1 as a alteration filing at 2750 Homecrest Avenue, Brooklyn, NY 11235. Its latest published status category is Approved, dated Aug 6, 2026. The filing records 168 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 6, 2026
Proposed scale
168 proposed dwelling units
Applicant of recordSee the 25 filings that name Srl Associates
FiledOct 19, 2021
Current recordApproved
Proposed scale168 units
Recorded cost$10,000

What the filing says

A public-record reading of the proposed work.

INSTALLATION of 300 psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story elevator apartment building built in 1959, with 188 homes, on a 53,730 sq ft lot.

Built
1959
Last altered
2013
Floors
7
Residential units
188
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
53,730 sq ft
Building area
194,425 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 12 open notices on record for this building, out of 41 notices on file; the most recent was issued Aug 11, 2026.

  • Construction

    Issued Aug 11, 2026 — EMERGENCY WORK. AT TIME OF INSPECTION OBSERVED DETERIORATED OVERHEAD CONCRETE SLAB INCLUDING SEVERAL SPALLING AND EXPOSED RUSTED REINFORCEM ENT. ALSO OBSERVED A SEVER VERTICAL 1/2 INCH WIDE CRACK AT COLUMNS AT MULTIPLE LOCATIONS. ALSO OBSERVED CRACKED BEAMS AND SLAB OVERHEAD AT M ULTIPLE OVERHEAD LOCATION. REM:OWNER MUST IMMEDIATELY HIRE (RDP)

  • Construction

    Issued Dec 12, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED DEFECT BALCONY SLAB & CEILING AT ALL EXPOSURES BALCONIES: DAMAGED STUCCO/ PAINT, CRACK & EXPOSURE REBAR AND DEFECTED FIRE ESCAPE CORROSIONS ALSO DAMAGEDMASONRY WALL AT ENTRANCE. REMEDY: REPAIR AND/OR REPLACE

  • Construction

    Issued Aug 22, 2025 — EMERGENCY WORK ORDER. OCCUPIED 1LVL PARKING STRUCTURE, CRACKED/SPALLIN CONCRETE COLUMNS, BEAMS & SLAB VARIOUS LOCS CAUSING HAZARD TO VEHICULA & PED TRAFFIC. REMEDY: OWNER TO RETAIN QPSI TO DIRECT & SUPERV SAFE MEAS TO PROTECT UNSAFE AREAS, ENSURING CLEAR DELINEATION & SAFE NAVIGA AROUND UNSAFE AREAS. MEAS MUST PREVENT ACCESS TO THESE AREAS

  • 9 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00613348-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00613348-I1
BIN
3246945
BBL
3087640010
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
168
Proposed dwelling units
168
Sidewalk shed