NYC DOB record · X01429959-I1

2757 Claflin Avenue

2757 Claflin Avenue, Bronx, NY 10468

Alteration filing in Kingsbridge Heights-Van Cortlandt Village, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01429959-I1

2757 Claflin Avenue

Bronx, NY 10468

Alteration filing · status dated Oct 9, 2026

Current record
Approved
Proposed scale
6 stories
Dwelling units
83
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01429959-I1 as a alteration filing at 2757 Claflin Avenue, Bronx, NY 10468. Its latest published status category is Approved, dated Oct 9, 2026. The filing records 6 proposed stories and 83 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 9, 2026
Proposed scale
6 proposed stories and 83 proposed dwelling units
Applicant of recordSee the 126 filings that name Kma Designs LLC
FiledJul 13, 2026
Current recordApproved
Proposed scale6 stories
Recorded cost$21,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.. all work to comply with chapter 33 of nycbc

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1927, with 83 homes, on a 20,000 sq ft lot.

Built
1927
Floors
6
Residential units
83
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
20,000 sq ft
Building area
103,200 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 12, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 31 notices on file; the most recent was issued Jun 18, 2026.

  • Construction

    Issued Jun 18, 2026 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. -REFER TO VIOLATION- REMEDY: COMPLY WITH COMMISSIONER'S ORDER

  • Construction

    Issued Jun 9, 2026 — EWO DUE TO INCIDENT ON 6/9/26.2 SECTIONS OF DECORATIVE PRE-CAST CONCRETE ELEMENTS DETACHED & FELL TO SIDEWALK. REMEDY:OWNER TO IMMEDIA RETAIN NYS RDP WITH QEWI CERTIFICATION TO INSPECT ALL PRE-CAST CONCRET PANELS & PROVIDE METHOS FOR SAFE REMOVAL OF REMAINING LOOSE/DISPLACED METAL. PROVIDE DAILY REPORT TO FACADES@BUILDINGS.NYC.GOV

  • Construction

    Issued Jun 9, 2026 — FTM EXTERIOR BLDG FACADE & APPURTANCES DUE TO INCIDENT THAT OCURRED 6/9/26 2 SECTIONS OF PRE-CAST CONCRETE DETACHED & FELL TO SIDEWALK REMEDY:OWNER TO RETAIN NYS RDP WITH QEWI CERT & MASONRY FACADE & PRE- CAST EXP TO INSPECT & EVALUATE 100% HANDS ON.TAKE/PROVIDE SAFE MEASURE RDP TO SUBMIT REPORT TO FACADES@BUILDINGS.NYC.GOV

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 12, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01429959-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 79,351 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01429959-I1
BIN
2015368
BBL
2032490163
Review type
Professional Certification
Existing stories
6
Proposed stories
6
Existing dwelling units
83
Proposed dwelling units
83
Sidewalk shed