What the filing says
A public-record reading of the proposed work.
Proposed support of excavation for removal of the topsoil to the bedrock at 2758 kingsbridge terrace in conjunction with job #: x01315816-i1.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a vacant land on a 9,885 sq ft lot.
- Residential units
- 0
- Building type
- Vacant land
- Land use
- Vacant land
- Zoning district
- R6
- Lot area
- 9,885 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 16, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 1 notice on file; the most recent was issued Mar 3, 2026.
- Construction
Issued Mar 3, 2026 — FTM RW.PRPERTY IS A VACANT CONSTRUCT SITE W/ ACTIVE PERMT UNDR SE JOB ALONG EXP2 LOTLINE, A STONE RW APRROX 10' TALL & 113' LONG. GRADE WAS EXCAVTED ALONG EXP2 RW.RW HAS MULTI CRCKS W/LOOSE STONES ON TOP.RMDY: RETAIN NYS PE TO EVALUTE RW ONPROPRTY & FILE REPAIRS DW65W/ DOB RW TO BE PERMANTLY REPAIR UNDR PERMT BY 3/30/26 & SIGNED OFF BY05/15/26
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 16, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01282349-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 62,630 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01282349-I1
- BBL
- 2032530086
- Postal code
- 10463 · 143 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0