What the filing says
A public-record reading of the proposed work.
Proposed new eleven (6) stories building with reinforced concrete footing and foundation wall will be proposed for foundation design to this new building
Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a vacant land on a 9,885 sq ft lot.
- Residential units
- 0
- Building type
- Vacant land
- Land use
- Vacant land
- Zoning district
- R6
- Lot area
- 9,885 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 6, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 1 notice on file; the most recent was issued Mar 3, 2026.
- Construction
Issued Mar 3, 2026 — FTM RW.PRPERTY IS A VACANT CONSTRUCT SITE W/ ACTIVE PERMT UNDR SE JOB ALONG EXP2 LOTLINE, A STONE RW APRROX 10' TALL & 113' LONG. GRADE WAS EXCAVTED ALONG EXP2 RW.RW HAS MULTI CRCKS W/LOOSE STONES ON TOP.RMDY: RETAIN NYS PE TO EVALUTE RW ONPROPRTY & FILE REPAIRS DW65W/ DOB RW TO BE PERMANTLY REPAIR UNDR PERMT BY 3/30/26 & SIGNED OFF BY05/15/26
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 6, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01315816-S2.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,944 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01315816-S2
- BBL
- 2032530086
- Postal code
- 10463 · 443 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- 6
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- 0