What the filing says
A public-record reading of the proposed work.
Installation of sidewalk shed & scaffold during construction. sidewalk shed & scaffold shall comply with nycc 2014 chapter 33 . no change in egress, use, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story mainly residential with some commercial built in 1920, with 6 homes, on a 3,032 sq ft lot.
- Built
- 1920
- Last altered
- 2008
- Floors
- 4
- Residential units
- 6
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- C4-3
- Lot area
- 3,032 sq ft
- Building area
- 9,804 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 18 notices on file; the most recent was issued Oct 4, 2023.
- Fail to certify class
Issued Oct 4, 2023 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Plumbing
Issued Dec 27, 2022 — COMMISSIONERS REQUEST FOR IMMEDIATE CORRECTIVE ACTION I OBSERVED IN APARTMENT 3L STOVE AND OVEN WAS LEAKING GAS OBSERVED CONDITION(S) DOES NOT COMPLY WITH SECTION 28-301.1 OF THE B02 AND PRESENTS AN IMMINENT RISK TO PUBLIC SAFETY. CORRECT THE SITUATION WITHIN 48 HOURS
- Construction
Issued Aug 20, 2022 — APPLICANT ON RECORD, ALBERTO ROMAN, PE#95364 SURRENDERED ALL .FILING PRIVILEGES, THEREFORE PURSUANT TO AC 28-105.10.2 BOROUGH .COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER JOB #B00508151-L1
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00551092-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00551092-I1
- BBL
- 3021410008
- Postal code
- 11211 · 3611 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 6