What the filing says
A public-record reading of the proposed work.
Installation of suspended scaffold for facade inspection/repair.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 18-story office building built in 1900, on a 4,726 sq ft lot.
- Built
- 1900
- Floors
- 18
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C6-4A
- Lot area
- 4,726 sq ft
- Building area
- 93,615 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 8, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 19 open notices on record for this building, out of 86 notices on file; the most recent was issued Jan 9, 2026.
- Construction
Issued Jan 9, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TH E TIME OF INSPECTION,I OBSERVED ON EXP3 WEST ELEV:DAMAGED BRICK WORK A T LINTEL,MISSING BRICKS AT UPPER FLOORS.ERODED BRICK JOINTS.REMEDY:REP AIR AND/OR REPLACE DAMAGED BRICK WORK
- Construction
Issued Dec 28, 2022 — THE DOB HEREBY ORDERS YOU TO STOP ALL WORK UNDER JOB #140879850 DUE TO SITE SAFETY MANAGER WITHDRAWAL
- Construction
Issued Dec 28, 2022 — THE DOB HEREBY ORDERS YOU TO STOP ALL WORK UNDER JOB #140879850 DUE TO SITE SAFETY MANAGER WITHDRAWAL
16 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 8, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01463754-I1.
- Current status updated02
The latest recorded filing status is “Pending Plan Examiner Assignment.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 77,401 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01463754-I1
- BIN
- 1001635
- BBL
- 1001490033
- Postal code
- 10007 · 177 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source