NYC DOB record · M00916397-I1

28 East 22 Street

28 East 22 Street, Manhattan, NY 10010

Alteration filing in Midtown South-Flatiron-Union Square, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 1, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00916397-I1

28 East 22 Street

Manhattan, NY 10010

Alteration filing · status dated Aug 27, 2026

Current record
Recorded as completed
Proposed scale
9 stories
Dwelling units
9
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00916397-I1 as a alteration filing at 28 East 22 Street, Manhattan, NY 10010. Its latest published status category is Recorded as completed, dated Aug 27, 2026. The filing records 9 proposed stories and 9 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Aug 27, 2026
Proposed scale
9 proposed stories and 9 proposed dwelling units
Applicant of recordSee the 12 filings that name Geiger E&a Group CORP.
FiledSep 18, 2023
Current recordRecorded as completed
Proposed scale9 stories
Recorded cost$250,000

What the filing says

A public-record reading of the proposed work.

Localized facade repairs for ll-11 . work includes brick replacement/ pointing; coping stone & windowsill replacement; window lintel restoration, etc. work also includes fire escape restoration. no change of egress, use, occupancy, bulk or height

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 9-story elevator apartment building built in 1903, with 9 homes, on a 2,300 sq ft lot.

Built
1903
Last altered
1983
Floors
9
Residential units
9
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
M1-5M
Lot area
2,300 sq ft
Building area
19,226 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 26 notices on file; the most recent was issued Mar 20, 2023.

  • Construction

    Issued Mar 20, 2023 — EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE AT EXPOSURE#3(SOUTH EL)OB SERVED FIRE ESCAPE@2,3,4TH FLRS HAVE SEVERAL CORRODED STEEL CONNECTION AND IN UNSAFE CONDITIONS BASED ON TR6 FILING UNSAFE 902354 9B 001 REMEDY:IMMEDIATELY REPAIR/RESTORED FIRE ESCAPE AT SEVERAL FLOORS TO BE SECURE/SAFE FOR THE TENANTS AND FIRE ESCAPE USAGE

  • Hazardous condition (facade)

    Issued Feb 15, 2023 — CYCLE 9B UNSAFE REPORT FILED

  • No report and / or late filing (facade)

    Issued Jul 31, 2018 — FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00916397-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00916397-I1
BIN
1016258
BBL
1008500058
Review type
Standard Plan Examination
Existing stories
9
Proposed stories
9
Existing dwelling units
9
Proposed dwelling units
9
General construction